Friday 30 May 2014

Lights, camera, action!

After the last post, we have another week of nothing happening, and we are able to sleep late. Then it all changes this week:
Monday 26 the electricians arrive, spend the day putting up tracklights, installing powerpoints and switches. We have light! The bad news is that the exterior spotlights spoil the look of our triangular window in the gable. We chose their position from the outside, considering it from the exterior point of view, and didn't think about how it would look from inside. May be fixable.
Tuesday, we are awoken early by the plumber wanting to turn the water off so that he can relocate one of the pipes under the sink, which would otherwise have finished up in the bin drawer.
By Wednesday my body clock is adjusting to early, and I am up at 10 to 7, showered and dressed by 7. No one comes.
Thursday the roofer comes and finishes the guttering and downspouts, doing a lovely neat job. The downpipes are not yet connected to the storm water drains, but at least the water is coming off the roof in a more controlled fashion.
Friday, and at last, the skylights arrive and are being installed as I write. Camera to be employed when they are done. Builders are also here levelling the floor, filling in gaps around the windows, and putting up architraves. And the hard plasterers, busy filling gaps in the back wall.
Meanwhile we have been trying to finalise all kinds of other things and having the usual two steps forward, one step back experiences. On Monday we found that the range hood we chose months ago has been discontinued. We might, if we are lucky, be able to buy the display one, but that has to be approved by a manager, who has apparently been sick all week. We are also told by the kitchen people, who have contacted Laminex, that the laminate we had chosen for the benchtops couldn't be formed to give the modern wrap-around look. Wednesday things take a turn for the better. We trek out to the Laminex showroom at Tullamarine and confirm that the laminate can be formed. On the way back we find a tile distributor who locates the last 7 square metres of 200x200 terracotta floor tiles in captivity - our builder told us that he thought we wouldn't get the size (no longer fashionable) and our sorties into tile shops thus far seemed to confirm this. We decide to buy the lot, even though we probably only need about half, so we have spares against any future contingencies. We still have fingers crossed on the range hood. It is an IKEA product, and you can't ring an IKEA store, only their central enquiries, which is maddening. After a bit of shouting on Wednesday, the central enquiries person contacts the store for me, comes back with the information that the manager who has to approve the sale of a display item is sick, but they will call. They still haven't and I'm wondering if I have the energy for another lot of shouting, or whether to wait until Monday.











Looking in (above)



Looking out (right and below).
The partition wall on the left is NOT blue - that's just a trick of the light.

Wednesday 14 May 2014

Day 50ish: Real progress!

Lots of activity for the past week. Nothing Monday, but first thing Tuesday guys arrive to put the insulation into the walls and ceiling prior to the plastering. They have an amazing technique of impaling the batts with a pronged stick and poking them up into the ceiling - no ladders (see below) rather like pitchforking hay.
 Electricians are also due Tuesday, but are prevented by illness.
On Wednesday, we spend a happy morning with them working out where all the lighting tracks will go. In the middle of it, a bloke arrives with a truckload of plaster board, expecting to meet the plasterers. Who aren't there. So Peter and I learn the techniques for getting 6m lengths of plaster board off a flat bed truck and into a house without damage. We leave them next door, as the electricians are busy in our place - so handy having a two site project.
Plasterers Mick, Drew and Dallas arrive Thursday, work solidly for four days and have finished all the plaster board work by Tuesday (yesterday). Chris the carpenter comes back on the intervening Saturday to finish the cladding under the eaves.
Today (Wednesday again) the Zeev kitchen man David comes and with the room starting to look finished, can finally come to grips with how it's all going to work. Now we just have to source the sink and range hood, and consult with the plumber about relocating water and gas pipes. The shelves my Dad lovingly constructed over 30 years ago are going back on the wall, although one set will require a minor adjustment to fit in again. Chris makes another brief appearance to do a bit more work on the exterior.
Next steps include hard plaster on the back wall, filling in spaces in the floor, and fitting the skylights which will be a major excitement as we will finally know how much difference they will make to the light in the room.
Latest pictures:
Forking up another batt

Post-plastering: looking back toward the kitchen

From the doorway looking out - note the sexy new roof line.

Saturday 3 May 2014

Day 37 to 40ish

Yes, I've lost count. Attendance has been so intermittent it's hard to remember. But last week we had builders & electricians on Thursday and Friday. There were men in the roof, men in the cupboards (en route to the roof via the manhole) and the 'roughing in' of the wiring is done. The 3/4 wall at the back of the stove is now framed, so that the kitchen is defined again. On Saturday, to our surprise, Chris braved the rain and cold, working from dawn to dusk on the outside panelling. We headed out on Friday to buy track lighting, ready for Tuesday when they are coming to finalise the position of the tracks.
Meanwhile, we have started the kitchen project again, with another trip out to Zeev, in Springvale this time. After discussions and much thinking and measuring during the week, I think we have the layout of the cupboards finalised, and the quote isn't too scary. Unsurprisingly, they are going to be very similar to the old ones, with a minimum amount of reshaping and reshuffling.