Wednesday 26 March 2014

Day 28-9: Tank installed, more windows fitted

Plumber came to re-arrange what we thought were water pipes. A big galvanised iron pipe turned out to be gas, but fortunately nothing burst into flame when he cut the pipe. It and its attachments were duly re-routed, and the tank did indeed fit through the window opening with about a centimetre to spare all round. It is now sitting in place in the lightwell, waiting for the roofers to return to fix downpipes.
Picture shows the tank in place, shot through the window that it went through, with the window now in place.
Fitting of windows continued, so that all are now in place except the tiny triangular one at the back of the kitchen. Several of the windows have frames only at this stage - they will be glazed in place. In the pictures below you can see that the big window on the left is unglazed, as is the fixed panel of the sliding doors.
 It is at last beginning to look a bit like a house again.



From the inside looking out








From the outside looking in.